As the weather was scorching, I mountain biked the Saratoga Gap and Peters Creek trail in Saratoga (starting at the Vista Point parking lot at Highway 9
and Skyline Boulevard).
I arrived just before 9:05 am and rode my 2011 Specialized S-works FSR with newly built wheels. The rear tire flat has been fixed at Silva Cycles.
I arrived just before 9:05 am and rode my 2011 Specialized S-works FSR with newly built wheels. The rear tire flat has been fixed at Silva Cycles.
The trail started with an easy climb to a single track with an excellent
green tree cover. I recorded a nice high-definition GoPro 4
video on my ride here:
I also tracked my progress on Strava and had an excellent recording of my progress on Relive.
I also took some iPhone photos on the ride.
The ride took about 1 hour and 15 minutes. I really liked this trail - it's not as tiresome as Almaden Quicksilver County Park - but it is more scenic with many different sections of single track and technical descents. I hope to ride it once again.
Here are my Strava statistics:
I also tracked my progress on Strava and had an excellent recording of my progress on Relive.
I also took some iPhone photos on the ride.
The ride took about 1 hour and 15 minutes. I really liked this trail - it's not as tiresome as Almaden Quicksilver County Park - but it is more scenic with many different sections of single track and technical descents. I hope to ride it once again.
Here are my Strava statistics:
Ride
Biking Saratoga Gap
9:15 AM on Saturday, August 26, 2017 · Santa Clara County, California
- Distance
- 8.48 mi
- Elevation gain
- 1,250 ft
- Moving Time
- 1:18:01
- Estimated Avg Power
- 120 W
- Avg Speed
- 6.5 mi/h
- Calories
- 474
Recorded route
Map data: © OpenStreetMap contributors · ODbL. Route recorded with Strava.
● Start ● Finish
Elevation · elapsed time
Maximum recorded elevation: 2,715 ft
More activity details
- Energy Output
- 563 kJ
- Max Speed
- 28.0 mi/h
- Elapsed Time
- 1:18:24
Activity recorded with Strava.



Post a Comment